KITCHEN RENOVATION GUIDE

How much does a kitchen renovation cost in Australia?

Start with what you want to keep, replace and move. Those decisions make a kitchen budget useful before you choose the finishes.

Illustration of a written quote

Build a budget for your kitchen

In short

Your kitchen renovation cost depends on its size, condition, finishes and the work involved. A cosmetic refresh keeps usable cabinets and the existing layout; a full replacement adds new cabinetry and installation; a layout change can also add plumbing, electrical, structural and approval costs. Build your budget from local quotes for the same scope, then add purchases outside the quote and a separate allowance for unexpected work. This guide does not give a national average that could hide those differences.

Step 1

Choose a refresh, replacement or new layout

A refresh might mean painting, replacing handles or changing sound cabinet doors. Replacing the whole kitchen in the same position is a larger job, even when the sink and cooktop stay put. Moving them, adding an island or removing a wall changes what needs to be assessed and priced.

Ask for separate prices for the essentials and optional upgrades. Keep useful parts of the kitchen where practical, but have damaged cabinets or water-affected areas checked before committing to a cosmetic fix.

What belongs in the kitchen budget?

What belongs in the kitchen budget?
Cost categoryWhat to have priced
Cabinets and installationRetained cabinet condition, new doors or complete units, standard or custom sizes, drawers, hardware, delivery and fitting.
Benchtops and splashbacksNamed material, thickness, edges, joins, cut-outs, measuring, fabrication, installation and removal of the old surface.
Plumbing, electrical and gasDisconnection and reconnection, moved service points, new circuits, lighting, rangehood ducting and any gas changes.
Appliances and fittingsExact appliance models, sink and tap, delivery, installation, ventilation clearances and disposal of replaced items.
Building work and approvalsWall changes, structural advice, required approvals, flooring repairs, plastering and painting after the kitchen is removed.
Removal and disruptionDemolition, waste disposal, access restrictions, protection of nearby rooms and temporary cooking arrangements.

Step 2

Give each company the same project brief

Photograph the whole kitchen and problem areas. Add a rough measured plan showing doors, windows and existing services. Label measurements as approximate so the installer knows a site check is still needed.

Use the example below as a starting point, then replace it with your actual choices. Set your total spending limit and say whether it includes appliances and money reserved for unexpected work.

Step 3

Resolve material and approval questions early

Check the proposed work with your council or building certifier before ordering. Approval requirements depend on the property, location and changes involved. In a strata property, also check the scheme's rules. NSW, for example, requires approval for kitchen renovations such as installing or removing cupboards; a cosmetic refresh is not automatically the same category.

Have appropriately licensed trades handle electrical, plumbing and gas work. If you want induction cooking, ask the electrician to assess the supply and circuit requirements for the selected appliance. Have proposed structural changes assessed before a wall is removed.

Step 4

Compare the full cost before signing

Compare quotes against your brief line by line. A cabinet supply price cannot be compared directly with a price that includes demolition, fitting and trade connections. Add anything you will buy separately, required fees and temporary living costs to see the total project commitment.

Ask which amounts are fixed and which are allowances. A prime cost item is an allowance for an item not yet selected or finally priced; a provisional sum is an estimate for work whose cost cannot yet be determined. Ask how actual costs, labour and margins will change the final price. Keep money aside for unexpected work based on the condition and uncertainties identified at the site visit.

Get the agreed scope, exclusions, payment stages and timing in writing. If something changes during the job, record the work, price and effect on completion before agreeing to it.