BATHROOM BUDGET GUIDE

How much does a bathroom renovation cost in Australia?

Start with what you want to change, then price the work your bathroom actually needs.

Illustration of a written quote

Build your bathroom budget in five steps

In short

Your bathroom renovation cost depends on the scope, location, existing condition and fixtures you choose. A cosmetic refresh, a full replacement in the same layout and a layout change need different budgets. This guide does not give a national price range: it has no verified current dataset that would make one reliable. To set your budget, get written quotes after a site inspection, add costs you will pay separately and reserve money for unexpected work.

Step 1

Choose the scope before asking for prices

Write down the room dimensions, what you will keep and what you will replace. Include any leaks, damaged surfaces or access problems. Photos help, but they cannot show the condition behind walls or under tiles.

These are planning categories, not price bands. A small bathroom with hidden damage can need more work than a larger room in sound condition.

Three bathroom renovation scopes

Three bathroom renovation scopes
ScopeWhat to include in the brief
Cosmetic refreshPaint, accessories or selected fittings, with the layout and wet-area surfaces retained. Ask whether the work will disturb existing waterproofing.
Full replacement, same layoutStrip-out, surface preparation, waterproofing, tiling and new fixtures. Keeping locations does not mean old pipes or damaged framing can stay.
Layout or structural changeMoving plumbing points, changing walls or expanding the room. Ask about design, structural advice, approvals and changes to services.

Step 2

Account for the trades and fixtures

Depending on the scope, the work may involve a builder or renovation contractor, plumber, electrician, waterproofer, tiler, carpenter, cabinetmaker, glazier and painter. Ask who coordinates the work and which trades are included in the price.

Choose fixture models and tile finishes before signing where possible. A prime cost item is an allowance for a fixture or fitting that has not been fully selected or priced. A provisional sum is an estimate for work whose cost is not yet known. Either can change the final bill.

Step 3

Check waterproofing and permissions early

Waterproofing is the system that keeps water out of the building beneath wet-area finishes. Ask what areas will be treated, how the surface will be prepared and what records you will receive. Confirm the required credentials for that work with your state or territory regulator.

Licence, permit, contract and insurance requirements vary by jurisdiction and project. Check with your council or building certifier before work starts. In a strata property, check the owners corporation or body corporate process too. NSW, for example, treats renovations involving waterproofing as major renovations requiring strata approval.

Illustration of a licence check

Step 4

Compare quotes for the same bathroom

Give each contractor the same brief and selections, and arrange a site visit. Ask for more than one written quote. If a price is much lower, identify the different inclusions, allowances or exclusions before deciding.

Use the checklist below to ask each company what its price covers.

Step 5

Keep a reserve for unexpected work

Contingency is money set aside for costs you cannot confirm before work starts. Ask the contractor what remains unknown after inspection, such as concealed water damage or the condition of old pipes, and how those risks affect the reserve you need. There is no single percentage suitable for every bathroom.

Calculate your available budget against the quoted work, your separate purchases and fees, and that reserve. If this is your only bathroom, also plan and price any temporary arrangements while it is out of use.